Aia Document G701 Change Order – Every construction project is unique. Including payment terms and documents that must be provided to receive payment. Many construction projects require subcontractors to use payment applications. The American Institute of Architects (AIA) produces one of the most popular paid applications, AIA G702-1992. Here is a guide for each. List of AIA G702 Application Forms and Payment Confirmation
Payment apps, also known as A “payment application” or “payment app” is a document (or set of documents) that a construction project sends out to finalize its work. It’s like an invoice. But need a little more information.
Aia Document G701 Change Order

In architecture Invoices are usually simple and straightforward invoices from suppliers. Payment applications work a bit differently. There’s a reason they’re called
Owner Change Order Document
Their payment request Paid apps have a lot of supporting information and documentation. Payment applications often act as invoices. Pay when accredited by the architect or someone else.
Please follow the language of the contract and provide as much detail as possible. Paid app errors or miscalculations can result in your application being rejected and payment waiting longer.
The American Institute of Architects is a professional body of more than 90,000 licensed architects and other industry professionals. AIA is primarily focused on education and advocating for best practices in the construction industry. One of the main services the agency provides is standard AIA contract documents.
This document is one of the most commonly used contracts in the construction industry. They worked together to set up an AIA progress billing process that covered all types of delivery methods and any additional contract documents that might be required for a construction project. They have been drafted to not only be legal but also legal. But it is also fair and flexible for both parties in the contract.
G701 2017 Sample
The three most commonly used AIA contracts are often used side by side. These are Order Change Form G701, Application and Payment Certificate G702, and Continuous Document Form G703. This article discusses how to properly complete AIA Form G702.
At first glance, the AIA G702-1992 looks rather simple. It’s a one-page form with some contact information and nine checkout fields.
The first payment application you submit is always the easiest. Because nothing has changed, however, as the project progresses. Calculations can get more and more difficult. It’s easy to say, “How much do you owe me?” It’s more demanding. Full details of amount paid to date number of bookings used and the remaining cost of completing the operation

In this section, all “headers” must be completed at the top of the AIA G702 Payment Form. This is where the subcontractor provides all basic information about the project.
How To Fill Out The Aia G702 Application For Payment
This includes the name and address of the owner. The party requesting payment, the architect (if any), and the project itself.
The last part of the header stands for payment applications and contracts. This includes the application number (e.g. which application is 1st, 2nd, ninth) and the “period to date.” This date is the last day of the billing cycle covered by the application.
A “contract for” must include a brief description of the labor or materials you supply. along with the contract signing date and project number (if applicable).
The actual meat and potatoes portion of the AIA G702, which calculates all costs and deductions. And accuracy is important! Mistakes can cause the designer or owner to “underline” or reject the application. They will return it for you to customize. Pay attention to details as this can lead to payment delays and cash flow problems.
Completing Document On Demand Forms
This channel is simple because it doesn’t replace paid apps with paid apps. The original contract price is exactly what it sounds like.
Contract price. Must be the amount specified in the contract. This must not include disputed claims. order change or other amount
A change order is an agreement between you and the party that hired you to add or remove completed work. This happens with almost every project as construction rarely goes as planned. Sometimes work combines both.

Deducted in the same period If your project uses standard AIA documents, see the AIA G701 Directive Change Form Manual.
Line 2 can be positive or negative. A positive number means that we have added more jobs than the original contract required. A negative number means that the contract has broken or reduced the amount of work.
Calculate this figure by completing the table. “Summary of Order Changes” at the bottom left of the form. We’ll talk about this a bit more below.
“Contract sum” is the original contract price (row 1) plus the net change caused by the change order in row 2. To get this figure, Add line 2 to line 1. (If line 2 is negative, adding it to line 1 will decrease the total.)
The result is the total amount payable over the duration of the project as of today.
This is where continuation sheets come in handy. This must be done to get the sum of 4 rows.
Continuous worksheets are similar to lists of values. A value table is an agreement that shows the total work that must be completed during a project and the associated costs for each.
Continuous worksheets list tasks completed over a period of time, along with “Time value” or cost. The cost must match the cost in the value table. Continuous worksheets calculate the total amount of work completed up until the billing cycle. along with the value of all materials currently stored on the job site.

When generating G702, you can get the amount for the 4th row directly from the “total” in successive worksheets.
The reserve (or reserve) is a percentage of the payment that the GC or owner will hold until the project or work is complete. Your contract should detail your retention rates. This is usually between 5% and 10%. Note that many states require variable retention. This means that the reserve will be reduced or paid upon completion of the contract.
In this section, lines 5a and 5b list the amount withheld as a percentage. Multiply all the work done on line 5a, then multiply and add the total value of the material stored on line 5b. That amount is the total reserve withheld through the current application.
Subtract the total reserve amount calculated in line 5 from the completed work and material storage amount (line 4), which gives you the total billable amount you’ve received up to this point.
Delete previously received payments from this line. When the architect or property owner approves your paid app. They will issue proof of payment. This is your request authorization and payment receipt.
If it is the first payment application in the project, the value will be 0. However, in case of later application Enter the amount in line 6 of the previous certificate. Another reason document retention strategies can help!
Subtract row 7 from row 6 to get this number. This line shows the estimated amount you will be charged for the current period. The total billable amount for paid apps is the difference between “Total credits minus deductions” on line 6 and “Proof of previous payment” shown on line 7.
This is the amount remaining in the contract after the architect or owner has approved the current application for payment. Subtract the total amount of the contract as of the date from the “Total Received” in line 6. The result is the amount outstanding under the contract.

The result of this section will determine the number that will be used in line 2 of the payment application. All headlines must be specified.
Change the order before the billing cycle covered by the current application. The second line contains all approved change orders made during the current billing cycle.
Deductions from approved change orders After calculating the net change Insert this number into row 2.
Once you have entered all your payment information correctly in the AIA G702 Paid App. It’s time to sign and submit. Standard documentation is required for each paid app to be certified. So don’t sign paid apps until you’ve stood before a lawyer! However, if both parties deem that notarization is not required. can change the contract
The bottom right part is proof of payment. The contractor submitting the payment request should leave this section blank.
It will be filled out by an architect, project manager or property owner.